Skip to main content

Introduction

The model presented is a Renault Express phase 1. The engine is not original, it is the 1.9D from phase 2.

  1. Battery Preheating box
  2. Using a 10mm socket remove the nut holding the housing to the chassis. Remove the first two connectors by pushing the hook outwards and then pulling on it.
    • Using a 10mm socket remove the nut holding the housing to the chassis.

    • Remove the first two connectors by pushing the hook outwards and then pulling on it.

    • Remove the last connector using the 10mm socket.

  3. Reassembly is carried out in reverse order.
    • Reassembly is carried out in reverse order.

Finish Line

3 other people completed this guide.

laurent.immo13003

Member since: 03/03/2016

12,942 Reputation

155 Guides authored

0 Comments

Add Comment

View Statistics:

Past 24 Hours: 3

Past 7 Days: 9

Past 30 Days: 63

All Time: 2,843